Climate Resilient Inclusive Infrastructure for Ethnic Minorities (CRIEM) – Quang Nam Province

Project: Climate Resilient Inclusive Infrastructure for Ethnic Minorities (CRIEM) – Quang Nam Province
Location: Quang Nam province
Funded by: Asian Development Bank (ADB)
Categories:
– Detailed design, adjustment of Investment Policy & feasibility study report
– Construction of various buidings, water supply & drainage, electrical, mechanical, road, bridge, wharf and other technical infrastructures
– Social, environmental & financial consulting

Climate Resilient Inclusive Infrastructure for Ethnic Minorities (CRIEM) – Quang Nam Province: (1) Upgrading inter-commune roads, herbal medicine and Ngoc Linh ginseng areas, Nam Tra My district; (2) Upgrading the road connecting Truong river to Tra Giac commune, Bac Tra My district; (3) Road connecting resettlement area and production area in Nam Giang district; (4) Upgrading infrastructure to support tourism development in Co Tu cultural village, Tay Giang district; (5) Upgrading the irrigation system combined with domestic water for multi-purpose exploitation in Phuoc Nang commune, Phuoc Son district.

  • Site survey and/or investigation, detailed engineering designs, cost estimates and author supervision during construction
  • Preparation of bidding documents and procurement process assistance:
  • Environmental and social safeguards updating, monitoring and compliance
  • Support the PMU in project management

1. Upgrading inter-commune roads, herbal medicine and Ngoc Linh ginseng areas, Nam Tra My district

 

Nam Tra My road section after completion of concrete road surface

Bridge on Nam Tra My route in the process of completion

Drilling to check the quality of asphalt concrete pavement on Nam Tra My route

Pouring asphalt expansion joints on Nam Tra My route

2. Upgrading the road connecting Truong river to Tra Giac commune, Bac Tra My district

Excavating the ground for construction of the roadbed on the Bac Tra My route

Construction of box culvert across Bac Tra My route

Construction and quality control of concrete pavement on Bac Tra My route

3. Road connecting resettlement area and production area in Nam Giang district

Construction of Ca Dy road – Nam Giang district

4. Upgrading infrastructure to support tourism development in Co Tu cultural village, Tay Giang district

Construction of A Vuong River embankment – Tay Giang

5. Upgrading the irrigation system combined with domestic water for multi-purpose exploitation in Phuoc Nang commune, Phuoc Son district

Construction of A Vuong River embankment – Tay Giang district

Leave a Reply

Your email address will not be published. Required fields are marked *