1. Support Client in Design Work:
   – Consult, survey, review, and support the adjustment and updating of the Feasibility Study Report.
   – Review designs and estimates.
   – Support the approval, verification, and appraisal of designs, estimates, and infrastructure connection agreements with relevant agencies.
2. Support Bidding Work.
3. Update Reports, Environmental Management Plans, Site Clearance, Resettlement, Gender Action Plans, Monitoring, and Evaluation of Compliance with Environmental and Social Protection Measures.
4. Prepare Environmental and Social Assessment Reports, Financial Analysis, and Economic Efficiency for Additional Subprojects.
5. Construction Supervision and Project Management Support.

Construction of the southern approach road to Cua Dai Bridge in Hoi An city, Quang Nam province together with relevant works on the route such as: water channel on both sides, RC slab culverts, box culverts, RC drainage across the road, mobile vehicle load weighing station, bus stops, traffic safety system, lighting, reinforce the road slopes …

Cement-soil pile for soft soil treatment

Construction works

 

The road’s view from the Cua Dai bridge

Final road in use

Project: HA/W2: The southern approach road to Cua Dai Bridge in Hoi An – Urban Environment & Climate Change Adaptation Project in Hoi An City – ADB
• Location: Hoi An city, Quang Nam province, Vietnam
• Sponsor: Asian Development Bank (ABD)

Reference article: Thông xe tuyến đường dẫn cầu Cửa Đại Nam Hội An