Project: Climate Resilient Inclusive Infrastructure for Ethnic Minorities (CRIEM) – Quang Nam Province
Location: Quang Nam province
Funded by: Asian Development Bank (ADB)
Categories:
– Detailed design, adjustment of Investment Policy & feasibility study report
– Construction of various buidings, water supply & drainage, electrical, mechanical, road, bridge, wharf and other technical infrastructures
– Social, environmental & financial consulting
Climate Resilient Inclusive Infrastructure for Ethnic Minorities (CRIEM) – Quang Nam Province: (1) Upgrading inter-commune roads, herbal medicine and Ngoc Linh ginseng areas, Nam Tra My district; (2) Upgrading the road connecting Truong river to Tra Giac commune, Bac Tra My district; (3) Road connecting resettlement area and production area in Nam Giang district; (4) Upgrading infrastructure to support tourism development in Co Tu cultural village, Tay Giang district; (5) Upgrading the irrigation system combined with domestic water for multi-purpose exploitation in Phuoc Nang commune, Phuoc Son district.
- Site survey and/or investigation, detailed engineering designs, cost estimates and author supervision during construction
- Preparation of bidding documents and procurement process assistance:
- Environmental and social safeguards updating, monitoring and compliance
- Support the PMU in project management
1. Upgrading inter-commune roads, herbal medicine and Ngoc Linh ginseng areas, Nam Tra My district
Nam Tra My road section after completion of concrete road surface
Bridge on Nam Tra My route in the process of completion
Drilling to check the quality of asphalt concrete pavement on Nam Tra My route
Pouring asphalt expansion joints on Nam Tra My route
2. Upgrading the road connecting Truong river to Tra Giac commune, Bac Tra My district
Excavating the ground for construction of the roadbed on the Bac Tra My route
Construction of box culvert across Bac Tra My route
Construction and quality control of concrete pavement on Bac Tra My route
3. Road connecting resettlement area and production area in Nam Giang district
Construction of Ca Dy road – Nam Giang district
4. Upgrading infrastructure to support tourism development in Co Tu cultural village, Tay Giang district
Construction of A Vuong River embankment – Tay Giang
5. Upgrading the irrigation system combined with domestic water for multi-purpose exploitation in Phuoc Nang commune, Phuoc Son district
Construction of A Vuong River embankment – Tay Giang district